Archives: Document Library

DDOT’s Southeast Boulevard Feasibility Study Final Draft Released

Jan 07, 2016 | Posted in Barney Circle-Southeast Boulevard Documents, Project Updates
Tagged: ,

DDOT conducted a Feasibility Study to determine the project development process and the viability of the three concepts from OP’s Southeast Boulevard Land Use Study. The final draft of the Feasibility Study was completed and released on January 7, 2016. Southeast Boulevard Feasibility Study Draft Final

Fact Sheet: DBE Opportunities

Jul 22, 2015 | Posted in Document Library

Fact Sheet for the AWI's Disadvantaged Business Enterprise (DBE) Opportunities.

Fact Sheet: Parkside Pedestrian Bridge

Jun 09, 2015 | Posted in Parkside Pedestrian Bridge Documents

Fact Sheet from the AWI's Parkside Pedestrian Bridge project.

Fact Sheet: South Capitol Street Corridor

May 26, 2015 | Posted in South Capitol Street Corridor Documents

Fact Sheet from the AWI's South Capital Street Corridor project.