awi-logo-webmark
awi-logo-mark
awi-logo-ddot

Document Library

Below are all project-related documents, sorted in alphabetical order.

11th Street Bridge – RFK Stadium Lot 8 – New Traffic RoutesConstruction on the 11th Street Bridge will impact inbound and outbound traffic for RFK Stadium Lot 8. If you're going to the stadium this Spring, make sure you are familiar with the traffic routes. We've included a map for your easy reference.
11th Street Bridge CCC Meeting 15 Presentation – June 10, 2013The presentation from the 11th Street Bridge Project Community Communications Committee Meeting 15, on June 10, 2013.
11th Street Bridge Community Communications Committee Meeting Presentation – 6/11/12Presentation from the June 11, 2012 meeting of the 11th Street Bridge Community Communications Committee meeting. Includes construction updates and planned milestones.
11th Street Bridge Community Connection Newsletter – Summer 2014 editionSummer 2014 Newsletter 11th Street Bridge Community Connection Newsletter
11th Street Bridge Project – ASCE PresentationPresentation on the 11th Street Bridge Project Phase 1 design-build construction given on March 18, 2014 at the American Society of Civil Engineers Awards Banquet.
11th Street Bridge Project – Community Communications Committee Meeting Presentation – 3/11/2013Presentation from the March 11, 2013 meeting of the 11th Street Bridge Community Communications Committee. Includes construction updates and planned milestones.
11th Street Bridge Project – Community Communications Meeting 3/2012Presentation from the March 12, 2012 Community Communications Committee Meeting. Includes project update and future plans.
11th Street Bridge Project – Community Communications Meeting 9/2012Presentation from the September 10, 2012 Community Communications Committee Meeting. Includes project update and future plans.
11th Street Bridge Project – Special Edition Newsletter, Spring 201411th Street Bridge Project - Special Edition Newsletter, Spring 2014
11th Street Bridge Project Newsletter – Fall 2010Fall 2010 newsletter of the 11th Street Bridge project.
11th Street Bridge Project Newsletter – January 2011January 2011 newsletter of the 11th Street Bridge project.
11th Street Bridge Project Newsletter – June 2012June 2012 newsletter of the 11th Street Bridge project.
11th Street Bridge Project Newsletter – Summer 2013The 11th Street Bridge Community Connection newsletter - Summer 2013 edition prepared by the 11th Street Bridge Project team
11th Street Bridge Project Newsletter – Winter 2011Winter 2011 newsletter of the 11th Street Bridge project.
11th Street Bridge Project Presentation – Delaware Workshop 2/7/2012Presentation about the 11th Street Bridge project delivered at the 45th Mid-Atlantic Quality Assurance Workshop on February 7, 2012.
11th Street Bridge: Final Environmental Impact Statement (FEIS)Final Environmental Impact Statement for the 11th Street Bridges issued by the U.S. Department of Transportation Federal Highway Administration and District Department of Transportation in May of 2007.
Anacostia Riverwalk Trail – Kenilworth Aquatic Gardens Segment MapMap of the Anacostia Riverwalk Trail - Kenilworth Aquatic Gardens Segment.
Anacostia Riverwalk Trail – Kenwilworth Aquatic Gardens Segment: Design RenderingsDesign renderings of the Anacostia Riverwalk Trail - Kenilworth Aquatic Gardens Segment
Anacostia Riverwalk Trail Kenilworth Aquatic Gardens Segment construction Public Notice – July 2014Public Notice for the beginning of building and construction of portions of the Anacostia Riverwalk Trail Kenilworth Aquatic Gardens Segment on Anacostia Avenue NE and Hayes/Jay Street NE.
Anacostia Riverwalk Trail Map – District of ColumbiaMap of the various segments of the Anacostia Riverwalk Trail - includes trail segments that are planned for future construction.
Anacostia Riverwalk Trail Regional MapMap of the regional District of Columbia and Maryland Riverwalk Trail Network, including the Anacostia Riverwalk Trail.
Anacostia Riverwalk Trail: NPS Finding of No Significant ImpactFinding of No Significant Impact (FONSI) issued by National Park Service for the Anacostia Riverwalk Trail Segment 3 realignment.
Anacostia Waterfront Initiative: 10 Years of ProgressTen-year summary of progress report on the Anacostia Waterfront Initiative issued by the District of Columbia Government in September, 2010
Anacostia Waterfront Transportation Architecture Design GuidelinesArchitecture Design Guidelines for the Anacostia Waterfront issued by the District of Columbia Department of Transportation
AWI Employment ProfilePDF of the AWI Employment Profile
AWI Overview Presentation – DCPL, August 24, 2014AWI Overview presentation given at the Martin Luther King, Jr. Memorial Library on Sunday, August 24, 2014
AWI Transportation Master Plan – 2008The 2008 Anacostia Waterfront Initiative Transportation Master Plan.
AWI Transportation Master Plan – February 2014 UpdateThis is the February 2014 update of the AWI Transportation Master Plan - February 2014 Update
AWI Transportation Master Plan Update HandoutThe handout from the December 12, 2013 informational meeting for the AWI Transportation Master Plan Update.
AWI Workforce Development Job Readiness Summit PresentationPresentation given at the April 29, 2014 Workforce Development Job Readiness Summit.
Barney Circle – Westbound SE/SW Freeway to be Closed from Barney Circle to 8th StreetDescription provided for overview of lane closures from Barney Circle to 8th Street.
Barney Circle and Southeast Boulevard ConceptsBarney Circle and Southeast Boulevard Concepts presented at the February 21, 2013 Public Meeting.
Barney Circle and Southeast Boulevard General Concept Display BoardsDisplay boards presented at the Barney Circle and Southeast Boulevard Public Meeting on November 21, 2013.
Barney Circle and Southeast Boulevard Public Meeting – Comment SheetPublic comment Sheet from the Barney Circle - Southeast Boulevard Public Meeting on November 21, 2013.
Barney Circle and Southeast Boulevard Public Meeting PresentationPresentation delivered at the Barney Circle Southeast Boulevard Public Meeting on November 21, 2013.
Barney Circle and Southeast Boulevard Transportation Planning Study – Public Scoping Meeting 1 PresentationView the presentation from the 2/21/13 Barney Circle and Southeast Boulevard Transportation Planning Study - Public Scoping Meeting
Barney Circle Concept 1 with 15th Street ConnectionBarney Circle Concept 1 With 15th Street Connection
Barney Circle Concept 1 with Bus Concept 1Barney Circle Concept 1 With Bus Concept 1
Barney Circle Concept 1-Blvd Incorporating L StreetBarney Circle Concept 1-Blvd Incorporating L Street
Barney Circle Concept 2- Blvd Offset From L StreetBarney Circle Concept 2- Blvd Offset From L Street
Barney Circle Concept 3 With 14th Street ConnectionBarney Circle Concept 3 With 14th Street Connection
Barney Circle Concept 3 With Bus Concept 3Barney Circle Concept 3 With Bus Concept 3
Barney Circle Concept 3-Blvd Closest to CSXBarney Circle Concept 3-Blvd Closest to CSX
Barney Circle Concept Cross SectionsBarney Circle Concept Cross Sections
Barney Circle Concept Cross Sections 2Barney Circle Concept Cross Sections 2
DDOT AWI NEPA Transportation Master Plan 2007Anacostia Waterfront Transportation Master Plan issued by the District of Columbia Department of Transportation in 2007.
DDOT February 19, 2014 Information Session Registrants and AttendeesDDOT February 19, 2014 Information Session Registrants and Attendees
DDOT Information Session Master Presentation Feb 2014DDOT Information Session Master Presentation Feb 2014
DDOT Megaprojects CBE DBE Outreach SummaryPost-event summary report of the Megaprojects DBE/CBE Outreach Event on December 4, 2012 at Matthews Memorial Baptist Church.
DDOT Projects Update for Ward 7 Presentation – November 17, 2014Presentation given during DDOT's Projects Update for the Ward 7 Community on November 17, 2014
DDOT Projects Update for Ward 8 Presentation – October 6, 2014Presentation given at DDOT's October 6, 2014 Ward 8 Project Updates Meeting.
Fact Sheet: 11th Street BridgeFact Sheet from the AWI's 11th Street Bridge project.
Fact Sheet: Anacostia Riverwalk TrailFact Sheet from the AWI's Anacostia Riverwalk Trail project.
Fact Sheet: Anacostia Riverwalk Trail – Kenilworth Aquatic Gardens SegmentFact Sheet from the AWI's Anacostia Riverwalk Trail - Kenilworth Aquatic Gardens Segment project.
Fact Sheet: Barney Circle Southeast Boulevard Transportation Planning StudyFact Sheet from the AWI's Barney Circle Southeast Boulevard Transportation Planning Study project.
Fact Sheet: DBE OpportunitiesFact Sheet for the AWI's Disadvantaged Business Enterprise (DBE) Opportunities.
Fact Sheet: M Street SE/SW Transportation StudyFact Sheet from the AWI's M Street SE/SW Transportation Study project.
Fact Sheet: Parkside Pedestrian BridgeFact Sheet from the AWI's Parkside Pedestrian Bridge project.
Fact Sheet: Pennsylvania and Potomac Avenues SE Intersection Pedestrian Improvement ProjectFact Sheet from the AWI's Pennsylvania and Potomac Avenues SE Intersection Pedestrian Safety Improvement Project.
Fact Sheet: South Capitol Street CorridorFact Sheet from the AWI's South Capital Street Corridor project.
Fact Sheet: South Capitol Street TrailFact sheet from the AWI's South Capitol Street Trail Project.
M Street SE-SW Transportation Study – Public Meeting 3 PresentationPresentation from the September 13, 2013 M Street SE-SW Public Meeting.
M Street SE-SW Transportation Study Public Meeting 1 Presentation 1/24/12Presentation from the January 12, 2012 public meeting of the M Street SE/SW Transportation Study project.
M Street SE/SW Transportation Study – Public Meeting 2 Presentation 5/24/12Presentation from the May 24, 2012 public meeting of the M Street SE/SW Transportation Study project.
M Street SE/SW Transportation Study Final ReportThe M Street SE/SW Transportation Study Final Report has been completed as of Friday, December 21, 2012. A PDF copy of the full report, as well as the appendices, have been made available for public download here at the AnacostiaWaterfront.org website.
M Street Southeast-Southwest Special Events Study Final ReportThe Southeast-Southwest Special Events Study Final Report was completed in March of 2014. The report assesses the impact of multiple entertainment venues, most notably, the potential addition of a 20,000 seat Soccer Stadium, upon the transportation network in the Buzzard Point/Waterfront area in follow-up to the M Street/Southeast-Southwest Transportation Planning Study published in December 2012.
Middle Anacostia River Crossings (MAC) Transportation Study Final Report 2005Final report of the Middle Anacostia Crossings Tranportation Study issued by the District of Columbia Department of Transportation in June, 2005.
Parkside Pedestrian Bridge – Design Update Public Meeting 2Presentation from the May 24, 2012 design update public meeting of the Parkside Pedestrian Bridge project.
Pennsylvania and Potomac Avenues SE Intersection Pedestrian Improvement Project – 11/6/14 Information Display Booth BrochurePennsylvania and Potomac Avenues SE Intersection Pedestrian Improvement Project - 11/6/14 Information Display Booth Brochure
Pennsylvania-Potomac Avenue SE Intersection Pedestrian Safety Study – Public Comments Summary: 1-31-2013 Public Meeting 1Public Comments Summary: 1-31-2013 Public Meeting 1 - Penn-Potomac Pedestrian Safety Study
Pennsylvania-Potomac Avenue SE Intersection Pedestrian Safety Study – Public Meeting 2 Concept Alternatives HandoutThe Concept Alternatives Handout for the 2nd public meeting for the Pennsylvania-Potomac Avenue SE Intersection Pedestrian Safety Study held on May 16, 2013.
Pennsylvania-Potomac Avenue SE Intersection Pedestrian Safety Study – Public Meeting 2 Informational Display BoardsThe Informational Display Boards for the 2nd public meeting for the Pennsylvania-Potomac Avenue SE Intersection Pedestrian Safety Study held on May 16, 2013.
Pennsylvania-Potomac Avenue SE Intersection Pedestrian Safety Study Public Meeting 1/31/2013View the presentation from the 1/31/13 Pennsylvania-Potomac Avenue SE Intersection Pedestrian Safety Study Public Meeting.
Pennsylvania-Potomac Avenue SE Intersection Pedestrian Safety Study Public Meeting 5/16/2013View the presentation from the May 16, 2013 Pennsylvania-Potomac Avenue SE Intersection Pedestrian Safety Study Public Meeting.
Pennsylvania-Potomac Avenue SE Intersection Pedestrian Safety Study- Public Meeting 2 AgendaThe agenda from the 2nd Pennsylvania-Potomac Avenue SE Intersection Pedestrian Safety Study Public Meeting held on May 16, 2013.
Pennsylvania-Potomac Avenue SE Intersection Pedestrian Safety Study- Public Meeting 2 Concept Alternatives Comment Sheet –The Concept Alternatives Comment Sheet from the 2nd public meeting for the Pennsylvania-Potomac Avenue SE Intersection Pedestrian Safety Study held on May 16, 2013.
Skills Development Inquiry FormPDF of the AWI Skills Development Inquiry Form
South Capitol Street Community Update Meeting Presentation – May 4, 2006Presentation given during the May 4, 2006 South Capitol Street Community Update Meeting
South Capitol Street Corridor – Environmental Impact StatementSouth Capitol Street Corridor - Environmental Impact Statement
South Capitol Street Corridor Pre-SOQ Meeting PresentationView the presentation given at the South Capitol Street Corridor Pre-SOQ Meeting Presentation on June 27, 2013.
South Capitol Street Corridor Project Industry Day Attendance ListList of attendees at the South Capitol Street Corridor Project Industry Day on January 14, 2013 at Matthews Memorial Baptist Church.
South Capitol Street Corridor Project Industry Day PresentationView the presentation given at the South Capitol Street Corridor Project Industry Day on January 14, 2013.
South Capitol Street Corridor Project Update Presentation – ANC 6D Meeting 10/21/13The South Capitol Street Corridor Project Update Presentation given at the ANC 6D Meeting on October 21, 2013.
South Capitol Street Corridor Project: 2013 Design-Build Conference & Expo PresentationThe 2013 Design-Build Conference & Expo Presentation of the South Capitol Street Corridor Project.
South Capitol Street Corridor Project: 7/30/13 Project Information Update Meeting PresentationPresentation from the July 30, 2013 project information update meeting of the South Capitol Street Corridor Project
South Capitol Street Draft Environmental Impact Statement – Technical ReportsTechnical reports from the South Capitol Street Draft Environmental Impact Statement (DEIS)
South Capitol Street Draft Environmental Impact Statement/Section 4(f) Evaluation (January 2008)The January 2008 South Capitol Street DEIS/Section 4(f) Evaluation
South Capitol Street RenderingsNote: All renderings updated July 30, 2013
Southeast Boulevard Concept Details Display BoardsDisplay boards for the concepts presented at the Southeast Boulevard public meeting on November 21, 2013.
The Anacostia Waterfront Framework Plan – 2003The Anacostia Waterfront Framework plan developed by the District of Columbia Office of Planning in November of 2003.

Contact Us

Share Your Comments

Share your comments or feedback on the general AWI Program or specific projects.

Contact Us

AWI Email List

Stay Informed

Join our mailing list for the latest news and updates from the AWI Program.

Sign up!